Abstract
Building Information Modelling (BIM) workflows for prefabricated construction lack mechanisms that generate and compare alternative component configurations directly from a design model. Existing approaches define the optimisation search space manually and outside the model, address only one or two criteria, and treat the Work Breakdown Structure (WBS) as a post-design planning tool. This paper reinterprets the WBS as a generative decomposition mechanism. A WBS Engine decomposes the geometry of an existing BIM model into prefabricated subsystems before design decisions are fixed, producing the search space for optimisation without manual parametrisation. A Scenario Evaluator queries a database of 47 prefabricated components, and NSGA-II evaluates 60 configurations against four objectives. These are total cost, embodied carbon, assembly factor and number of lorry trips. Applied to a residential case study implemented in Dynamo, the prototype identified 16 non-dominated solutions. The best compromise configuration achieved a total cost of £150,444.01, 127,731.00 kgCO2e, an assembly factor of 0.190 and 10 lorry trips. Wall module size accounted for 17.4% of cost variation, while floor module size governed assembly complexity. The findings show that BIM-WBS integration with multi-objective optimisation supports informed early-stage decisions in industrialised construction.
| Original language | English |
|---|---|
| Article number | 2373 |
| Number of pages | 22 |
| Journal | Buildings |
| Volume | 16 |
| Issue number | 12 |
| DOIs | |
| Publication status | Published - 14 Jun 2026 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
-
SDG 11 Sustainable Cities and Communities
Keywords
- Building Information Modelling (BIM)
- design for manufacture and assembly (DfMA)
- multi-objective optimisation
- NSGA-II
- prefabrication
- Work Breakdown Structure (WBS)
Fingerprint
Dive into the research topics of 'BIM-integrated multi-objective optimisation of prefabricated construction configurations: a WBS-based generative decomposition framework'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver