Abstract
The A34 Newbury bypass crosses sensitive watercourses and incorporates runoff-control systems. The series of treatment stages of each system comprises an oil interceptor, silt trap, grassy slope and constructed wetland. In December 1998, a monitoring programme was initiated for one of the systems to evaluate the removal and behaviour of pollutants, and this paper presents the initial results. Future work will examine the mechanisms involved in metal removal and the fate of other pollutants.
| Original language | English |
|---|---|
| Pages (from-to) | 125-129 |
| Number of pages | 5 |
| Journal | Water and Environment Journal |
| Volume | 15 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - 2001 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 6 Clean Water and Sanitation
Fingerprint
Dive into the research topics of 'Constructed wetlands for the treatment of runoff from the Newbury bypass'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver