TY - JOUR
T1 - OSD: a framework for the early stage parametric optimisation of the structural design in BIM-based platform
AU - Hamidavi, Tofigh
AU - Abrishami, Sepehr
AU - Ponterosso, Pasquale
AU - Begg, David
AU - Nanos, Nikos
PY - 2020/3/14
Y1 - 2020/3/14
N2 - The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform the structural design, analysis and optimisation in a building information modelling (BIM)-based platform. This process starts with extracting the required information from the architectural model in Revit Autodesk, such as boundary conditions and designs different options of the structural models in Robot Autodesk. In this process, Dynamo for Revit is used to define the mathematical functions to use different variables and generate various structural models. The paper aims to expand the domain of automation in the BIM platform to reduce the iterative process in different areas such as conceptual structural design and collaboration between architects and structural engineers to reduce the time and cost at the early stages.
AB - The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform the structural design, analysis and optimisation in a building information modelling (BIM)-based platform. This process starts with extracting the required information from the architectural model in Revit Autodesk, such as boundary conditions and designs different options of the structural models in Robot Autodesk. In this process, Dynamo for Revit is used to define the mathematical functions to use different variables and generate various structural models. The paper aims to expand the domain of automation in the BIM platform to reduce the iterative process in different areas such as conceptual structural design and collaboration between architects and structural engineers to reduce the time and cost at the early stages.
U2 - 10.1108/CI-11-2019-0126
DO - 10.1108/CI-11-2019-0126
M3 - Article
SN - 1471-4175
VL - 20
SP - 149
EP - 169
JO - Construction Innovation
JF - Construction Innovation
IS - 2
ER -