Abstract
Monitoring suction variations within the construction materials of geotechnical infrastructure can provide essential information required to apply unsaturated soil mechanics to geotechnical problems related to climate risks. Such information can be useful in developing a strategy to mitigate climate risks at the design stage. Besides laboratory measurements, high capacity tensiometers can also be used for field measurements of suction. However, saturation, calibration, installation and long-term performance of these tensiometers need further consideration to ensure data accuracy. In this study, the response of tensiometers to pressurisation and cavitation cycles was investigated and the effect of the saturation time on the accuracy of the calibration was discussed. It was also found that temperature changes affect the tensiometer readings implying that temperature correction needs to be applied when tensiometers are installed in the field. A system was developed for field installation of tensiometers and measurement of suction in road subgrades. The installation system ensures occasional retrieving of the tensiometers when resaturation is required. The laboratory and field performances of the developed system showed that the accurate measurement of suction can be achieved.
Original language | English |
---|---|
Title of host publication | 17th European Conference on Soil Mechanics and Geotechnical Engineering, ECSMGE 2019 - Proceedings |
Editors | Haraldur Sigursteinsson, Sigurour Erlingsson, Sigurour Erlingsson, Bjarni Bessason |
Publisher | International Society for Soil Mechanics and Geotechnical Engineering |
Number of pages | 9 |
ISBN (Electronic) | 9789935943613 |
Publication status | Published - 6 Sept 2019 |
Event | 17th European Conference on Soil Mechanics and Geotechnical Engineering - Reykjavik, Iceland Duration: 1 Sept 2019 → 6 Sept 2019 |
Conference
Conference | 17th European Conference on Soil Mechanics and Geotechnical Engineering |
---|---|
Abbreviated title | ECSMGE 2019 |
Country/Territory | Iceland |
City | Reykjavik |
Period | 1/09/19 → 6/09/19 |
Keywords
- Field installation
- Low volume road
- Suction
- Tensiometer